Restaurant & Gate Remodel & Expansion

Project Overivew

Restaurant Remodel & Expansion

The restaurant area at JAC will be expanded to twice its currents size. This project will allow for additional space and updated seating and service areas. A full basement will be constructed under the new restaurant to allow for additional storage. The new design has taken into consideration the flow of foot traffic, ease of access, and efficiency.

Gate Remodel & Expansion

The gate area adjacent to the restaurant will also be expanded, adding two additional boarding gates. Common use technology will be installed at the gates to allow for flexibility with space and airline operations. The pet relief area and mothers’ room will be relocated and will remain in-service throughout the duration of the construction of the new restaurant and gate area.

Timeline

Restaurant construction will begin in April of 2022 and is expected to be completed by the end of November of 2022. Interim food and beverage options will be available in a limited capacity, post-security, throughout the duration of this project.

PhaseDescriptionTimeline
Start DateConstruction BeginsApril 2022
Completion DateConstruction EndsNovember 2022

Renderings

FAQs

The restaurant area inside JAC will expand to twice its size which will allow for our guests to have additional space for seating and will have an ease of access and efficiency throughout the restaurant.

The pet relief area and mother’s room will remain in-service; however, the facilities will be relocated.

During construction, there will be food and beverage options at a limited capacity at JAC. We recommend that you bring some snacks from in town or home and an empty water bottle that may be filled at our water filling
stations located throughout.

All FAA and TSA regulations will apply, no liquids over 3.5 ounces will be allowed through security. We encourage all travelers to bring an empty water bottle while traveling as JAC and many other airports are equipped with water filling stations post-security.

More Projects

Ticketing Counter Expansion

Completion Date: May 2021
Learn More

TSA Checkpoint Remodel

Start Date: January 19, 2022
End Date: June 27, 2022

The Security Screening Checkpoint is the oldest part of the terminal building at JAC. To accommodate new security screening technology, the Checkpoint will be undergoing a complete remodel and expansion.

View Progress

Stay Connected

We Want to hear from you!

We are accepting feedback submission. Submit your thoughts today.
Submit Feedback

Stay Up to Date

Sign-up here for emails about construction schedules and progress

For questions or concerns about construction project at JAC, please email community@jhairport.org

Check your Flight Status

Use the toggle below to switch between Arrival and Departure Status

Reduce the impact of your flight with carbon offsets.

Summer Schedule

Current Conditions

Reduce the impact of your flight with carbon offsets.

48°F / 9°C

High 90°F / 32°C Low 43°F / 6°C

Current Skies: Clear
Current Visibility: 10 miles
Wind: 1 mph out of the North-Northeast

  • Sunday

    91°F / 33°C

    NNW 4 mph
  • Monday

    94°F / 35°C

    E 3 mph
  • Tuesday

    95°F / 35°C

    W 4 mph
Full Forecast